Florida General Contractor Course Notes

Study Florida General Contractor section notes, then jump straight into the guided course or related practice questions without losing your place.

Continue CourseStart PracticePDF downloads available in Pro.
Checking access

Checking Pro access...

Looking for your active Pro access before showing Course Notes. This usually takes just a moment.

Course Notes preview

Unlock Pro for the full per-exam reference guide.

Preview one piece from each section. Pro includes every Course Notes section, summary, key point, common mistake, exam tip, related-question review, and PDF export.

Includes full Course Mode and Course Notes.

Section 1Business and Finance (50%)Preview
More in this section
  • 19 more key points in Pro version
  • 9 more common mistakes in Pro version
  • 4 more exam tips in Pro version
  • 97 more related questions in Pro version

Summary

Business & Finance is one of the three examinations required for Florida Division I general-contractor licensure. Across the combined three-exam path it represents about half of the tested questions. Treat it as a contractor-business exam: entity/qualifier setup, bidding and contracts, purchasing, accounting, payroll, taxes, insurance, human resources, and Florida regulatory compliance.

Key Points

  • Florida Division I general contractors must pass Business & Finance, Contract Administration, and Project Management; do not study Business & Finance as if it were only estimating.

Common Mistakes

  • Using markup and margin as if they were the same percentage.

Exam Tips

  • Write the formula before touching the calculator; most finance misses are denominator mistakes.
Section 2Contract Administration (25%)Preview
More in this section
  • 16 more key points in Pro version
  • 8 more common mistakes in Pro version
  • 4 more exam tips in Pro version
  • 47 more related questions in Pro version

Summary

Contract Administration is a separate required Florida general-contractor exam. It tests preconstruction and bidding, project contracts, licenses/permits/inspections, and construction procedures/operations. The recurring decision pattern is: verify the contract and current facts, protect notice rights, obtain required authority, document the action, and coordinate cost/schedule consequences.

Key Points

  • Preconstruction estimating starts with scope and takeoff; distinguish quantity, unit cost, labor, equipment, subcontract, overhead, contingency, bond, tax, and schedule-risk components.

Common Mistakes

  • Treating a bid correction after the deadline as automatically permissible.

Exam Tips

  • On lien questions, build a mini timeline before choosing an answer.
Section 3Project Management (25%)Preview
More in this section
  • 18 more key points in Pro version
  • 9 more common mistakes in Pro version
  • 4 more exam tips in Pro version
  • 47 more related questions in Pro version

Summary

Project Management is the field-execution exam: construction methods/materials/equipment, OSHA safety, and reading plans/specifications. It rewards correct calculations and disciplined field control—use current documents, protect engineered systems, inspect before concealment, control temporary conditions, and stop unsafe or unauthorized work.

Key Points

  • Quantity math is testable: area, volume, cubic yards, grade/slope, elevations, waste/overage, and load intensity.

Common Mistakes

  • Forgetting to convert slab thickness from inches to feet.

Exam Tips

  • Write units beside every number.