Florida General Contractor Practice Test

Start today’s free 10-question Florida General Contractor set with source-backed explanations, local progress, and a fresh rotation every morning.

10 Free Daily Questions Source-backed Explanations 200 Verified Questions

Questions updated at Aug 24, 2026, 10:43 PM CDT

Go Pro - One Time Unlock

Unlock the full Florida Certified General Contractor bank

200 verified questions Exam Mode Practice Mode Detailed explanations Weak-area review No subscription - one-time unlock

Get the complete source-backed bank with Interview Questions, the full Study Guide, full Course Notes, detailed explanations, weak-area review, and exam-style practice.

Interview Questions Full Study Guide Full Course Notes Exam Mode Practice Mode Guided Course Detailed explanations Weak-area review No subscription
$4.99 One-time payment
See bundle and PDF options

We will confirm your site email in one quick checkout step.

Why DotCreds?

Practice with explanations that teach.

Source links for every answer Every wrong answer explained Guided Course included Practice and Exam Mode Weak-area tracking Same verified bank across web practice

What you get with free practice

10 Free Questions Daily Fresh set every day from the live bank
Detailed Explanations Learn with clear source-backed answers
Track Your Progress Daily history and performance insights
Upgrade Anytime Unlock the full bank when you are ready
Today's 10 Florida General Contractor questions

Use this Florida General Contractor practice test to review Florida Certified General Contractor. Questions rotate daily and each answer links back to the source used to write it.

Today’s Set
10 questions
Rotates at 10:00 AM local time
Progress
0/10
Answered on this page
Accuracy
0%
Loading countdown…

200 verified questions are in the live bank. Free daily questions are selected from a rotating sample set. Unlock Pro to access the full question bank.

Preparing today’s free questions... Ordering the final locked-bank set before showing the practice cards.
Question 1 of 10
Objective Use lawful employee selection procedures Managing Human Resources (6%)

A GC uses a written arithmetic test for crane riggers. Data show the test disproportionately excludes a protected group, and the tested math is unrelated to the rigger's actual job duties. What is the strongest HR concern?

Concept tested:
Question 2 of 10
Objective Prepare compliant bids Preconstruction Activities (27%)

A bidder submits a compliant bid at 1:45 p.m. for a 2:00 p.m. deadline. At 1:58 p.m., the bidder discovers an arithmetic error and wants to modify the bid. Which procedure is most defensible?

Concept tested:
Question 3 of 10
Objective Obtain required permits Obtaining Licenses, Permits and Approvals (20%)

A renovation contract requires complete interior demolition. The owner has approved the demolition plan, but the building permit covering demolition is not yet issued. No exemption applies. What should the GC do?

Concept tested:
Question 4 of 10
Objective Resolve conflicts between plans and specifications Reading Plans and Specifications (17%)

The architectural reflected ceiling plan locates a ceiling cloud at elevation 10'-0", while a structural brace shown on a later structural sheet occupies that space. The fabrication release is due today. What should the GC do?

Concept tested:
Question 5 of 10
Objective Comply with claim-of-lien timing Complying with Government Regulations (15%)

A lienor's final furnishing that counts under Chapter 713 occurred June 1. The owner asks the lienor to perform trivial warranty touch-up on August 20. The lienor assumes the touch-up automatically restarts the lien-recording clock. What is the safest conclusion?

Concept tested:
Question 6 of 10
Objective Estimate labor and comply with wage-hour law Managing Administrative Duties (26%)

A nonexempt carpenter works 50 hours in week 1 and 30 hours in week 2. Payroll proposes paying 80 straight-time hours because the two-week total averages 40 hours per week. Under the FLSA construction rules, what should the contractor do?

Concept tested:
Question 7 of 10
Objective Comply with trench protective-system requirements Safety (20%)

A trench is 4 ft 8 in. deep in soil that a competent person finds shows no indication of a potential cave-in. Which statement is most accurate under OSHA's cave-in protection rule?

Concept tested:
Question 8 of 10
Objective Develop the business plan and internal controls Establishing the Contracting Business (11%)

A startup GC projects $180,000 of payroll and vendor cash outflows in its first 45 days. Its first owner draw of $230,000 is contractually due on day 30 but historically takes 35 days after submission to collect. Which planning assumption is most defensible?

Concept tested:
Question 9 of 10
Objective Manage submittal, approval, fabrication, and delivery sequence Managing Trade Operations (10%)

A switchgear manufacturer needs 28 weeks after approved submittals. The electrical subcontractor asks to release fabrication from an unreviewed submittal to protect the schedule. What is the best trade-operations decision?

Concept tested:
Question 10 of 10
Objective Maintain daily logs and schedule updates Construction Procedures and Operations (13%)

The superintendent's daily logs show masonry production averaging 1,000 ft²/day for the last two weeks. The monthly schedule update still forecasts 1,600 ft²/day with no documented change in crew size, method, or conditions. What should the project manager do?

Concept tested:
Locked preview

You are viewing today’s free 10. Unlock 190 more questions.

Unlock full bank
Daily sample Rotating practice Free daily questions are selected from a rotating sample set.
Pro bank Full access Unlock Pro to access the full question bank, Exam Mode, Practice Mode, and random tests.
Florida Certified General Contractor Pro $4.99 one-time

Unlock all 200 Florida General Contractor questions, explanations, review tools, and exam-style practice.

50 Exam Practice Test $1.99 one-time

A 50-question Florida Certified General Contractor PDF for short review sessions. Questions come first, then the answer review and explanations later in the file.

All Access $6.99/month

Unlock every active practice exam, bundle and path experience, Pro course and study content, and included downloads.

What’s includedEvery current and future active practice exam, All active bundle and career-path practice content, Pro course lessons, study content, and supported paid downloads

Choose an unlock option to continue. We will confirm your site email in one quick checkout step.

Secure checkout powered by Stripe. Source-backed questions. Not brain dumps. Checkout stays on this page and unlocks the same Pro builder on this practice page.

Purchase options

Unlock the full Florida Certified General Contractor bank.

Get the full bank, Exam Mode, Practice Mode, question sets, random tests, readiness tracking, saved box scores, and review tools for this exam.

The PDF versions keep questions first and move the answer review, explanations, and distractor notes to the back of the file.

200 verified exam-style questions Every choice explained Exam Mode and Practice Mode Question sets and random tests Readiness score and trends Previous test box scores

You've answered 0/10 questions in today's set.

Locked: 190 more questions in the full bank.

Locked: exam simulation mode, practice mode, readiness tracking, and saved review history.

Checkout stays on this page, so you can keep practicing, unlock the full bank, and start Exam Mode or Practice Mode when you are ready.

Cheat Sheets

7-day score keeper

Answer questions today and this will become a rolling 7-day scorecard.

Local history
Optional progress sync

Keep today’s practice moving

Guest progress saves automatically on this device. Add an email later when you want a magic link that keeps your daily Florida Certified General Contractor practice in sync across browsers.

Guest progress saves on this device automatically

Guest progress is available without an account.

Source-backed answer review

The free daily Florida General Contractor set includes crawlable question text, answer choices, correct answer labels, objective mapping, and source links. Only the first SEO card includes answer explanations and any extra learning features. Pro-only bank questions stay locked; this section mirrors only the 10 free daily questions already shown on this page.

Question 1 A GC uses a written arithmetic test for crane riggers. Data show the test disproportionately excludes a protected group, and the tested math is unrelated to the rigger's actual job duties. What is the strongest HR concern?

Answer choices

  1. A. There is no issue because a facially neutral written test can never be discriminatory.
  2. B. The selection procedure may be unlawful because a practice with disparate impact must be job-related and consistent with business necessity.
  3. C. Treat the test as lawful whenever every applicant receives the same questions, even if the questions are unrelated to the job.
  4. D. The test is lawful if the hiring manager believes math skills show general intelligence.

Correct answer

The selection procedure may be unlawful because a practice with disparate impact must be job-related and consistent with business necessity.

B is correct. EEOC guidance recognizes that neutral selection practices can violate discrimination law when they disproportionately exclude protected groups and are not job-related and consistent with business necessity. A is incorrect because neutral practices can create unlawful disparate impact. C is incorrect because uniform administration does not by itself establish business necessity. D is incorrect because subjective preference is not a substitute for job-related validation/business necessity.

Wrong-answer review

  • A. There is no issue because a facially neutral written test can never be discriminatory.: neutral practices can create unlawful disparate impact.
  • C. Treat the test as lawful whenever every applicant receives the same questions, even if the questions are unrelated to the job.: uniform administration does not by itself establish business necessity.
  • D. The test is lawful if the hiring manager believes math skills show general intelligence.: subjective preference is not a substitute for job-related validation/business necessity.

Extra learning features

Why candidates miss this

The trap is the shortcut in “Treat the test as lawful whenever every applicant receives the same questions, even if the questions are…”. A facially neutral employment test can still create disparate-impact risk when it disproportionately excludes a protected group and is not job-related and consistent with business necessity. Use the stated dates, quantities, roles, documents, and governing rule instead of extending a familiar rule beyond the facts. Likely wrong answer: Treat the test as lawful whenever every applicant receives the same questions, even if the questions are unrelated to the job. Review focus: U.S. EEOC — Prohibited Employment Policies/Practices

Objective/domain: Managing Human Resources (6%)

Source: U.S. EEOC — Prohibited Employment Policies/Practices

Question 2 A bidder submits a compliant bid at 1:45 p.m. for a 2:00 p.m. deadline. At 1:58 p.m., the bidder discovers an arithmetic error and wants to modify the bid. Which procedure is most defensible?

Answer choices

  1. A. Wait until after 2:00 p.m. and email the corrected total because timely delivery of the original bid preserves a bidder's right to cure arithmetic errors after the deadline.
  2. B. Use the permitted pre-deadline modification or withdrawal procedure before 2:00 p.m.; do not rely on an informal revision after the deadline.
  3. C. Ask another bidder to confirm whether the correction would affect ranking before changing the bid.
  4. D. Open the submitted bid and alter the paper total by hand without documenting the change.

Correct answer

Use the permitted pre-deadline modification or withdrawal procedure before 2:00 p.m.; do not rely on an informal revision after the deadline.

Objective/domain: Preconstruction Activities (27%)

Source: AIA Contract Documents — Instructions: A701–2018, Instructions to Bidders

Question 3 A renovation contract requires complete interior demolition. The owner has approved the demolition plan, but the building permit covering demolition is not yet issued. No exemption applies. What should the GC do?

Answer choices

  1. A. Begin nonstructural demolition because only structural demolition requires a Florida building permit.
  2. B. Begin if the architect provides written approval.
  3. C. Begin if demolition is confined to nighttime hours.
  4. D. Do not begin the covered demolition until the required permit is issued.

Correct answer

Do not begin the covered demolition until the required permit is issued.

Objective/domain: Obtaining Licenses, Permits and Approvals (20%)

Source: Florida Statutes §553.79 — Permits; applications; issuance; inspections

Question 4 The architectural reflected ceiling plan locates a ceiling cloud at elevation 10'-0", while a structural brace shown on a later structural sheet occupies that space. The fabrication release is due today. What should the GC do?

Answer choices

  1. A. Follow the architectural sheet because architectural plans always outrank structural plans.
  2. B. Document the conflict and obtain an authorized design interpretation before fabrication.
  3. C. Follow the structural sheet and lower the ceiling cloud without design input.
  4. D. Release fabrication for both and resolve interference during installation.

Correct answer

Document the conflict and obtain an authorized design interpretation before fabrication.

Objective/domain: Reading Plans and Specifications (17%)

Source: AIA Contract Documents — Guide to Managing Construction Administration

Question 5 A lienor's final furnishing that counts under Chapter 713 occurred June 1. The owner asks the lienor to perform trivial warranty touch-up on August 20. The lienor assumes the touch-up automatically restarts the lien-recording clock. What is the safest conclusion?

Answer choices

  1. A. Any return to the project restarts a new 90-day lien period, including warranty or punch-list work performed after the original final furnishing.
  2. B. Do not assume trivial warranty work restarts the lien clock; calculate the 90-day deadline from the legally qualifying final furnishing.
  3. C. The lien may be recorded any time within one year after substantial completion.
  4. D. The 90-day period begins when the owner first refuses payment, not from furnishing.

Correct answer

Do not assume trivial warranty work restarts the lien clock; calculate the 90-day deadline from the legally qualifying final furnishing.

Objective/domain: Complying with Government Regulations (15%)

Source: Florida Statutes §713.08 — Claim of lien

Question 6 A nonexempt carpenter works 50 hours in week 1 and 30 hours in week 2. Payroll proposes paying 80 straight-time hours because the two-week total averages 40 hours per week. Under the FLSA construction rules, what should the contractor do?

Answer choices

  1. A. Pay 10 overtime hours in week 1 at at least 1.5 times the regular rate; the two workweeks cannot be averaged to eliminate overtime.
  2. B. Pay 80 straight-time hours because payroll may average two consecutive workweeks when the employee's total hours equal 80 and the pay period is biweekly.
  3. C. Pay 5 overtime hours because only hours above an average of 45 per week are premium time.
  4. D. Pay no overtime if the employee signed a biweekly averaging agreement.

Correct answer

Pay 10 overtime hours in week 1 at at least 1.5 times the regular rate; the two workweeks cannot be averaged to eliminate overtime.

Objective/domain: Managing Administrative Duties (26%)

Source: U.S. Department of Labor — Fact Sheet #1: The Construction Industry Under the FLSA

Question 7 A trench is 4 ft 8 in. deep in soil that a competent person finds shows no indication of a potential cave-in. Which statement is most accurate under OSHA's cave-in protection rule?

Answer choices

  1. A. A protective system is always required at 4 ft or deeper.
  2. B. A protective system is never required in a trench less than 5 ft deep if a competent person documents the depth, regardless of other soil or cave-in indicators.
  3. C. The trench may be entered without inspection because it is under 5 ft.
  4. D. A protective system is not automatically required solely by depth if the trench is under 5 ft and the competent person finds no indication of a potential cave-in.

Correct answer

A protective system is not automatically required solely by depth if the trench is under 5 ft and the competent person finds no indication of a potential cave-in.

Objective/domain: Safety (20%)

Source: OSHA 29 CFR 1926.652 — Requirements for protective systems

Question 8 A startup GC projects $180,000 of payroll and vendor cash outflows in its first 45 days. Its first owner draw of $230,000 is contractually due on day 30 but historically takes 35 days after submission to collect. Which planning assumption is most defensible?

Answer choices

  1. A. Treat the $230,000 as available on day 30 because recognized revenue and cash receipts are equivalent for liquidity planning.
  2. B. Finance or reserve enough working capital to cover the precollection cash gap rather than treating the day-30 billing date as cash on hand.
  3. C. Use project profit margin instead of timing because profitable projects cannot create cash-flow shortages.
  4. D. Exclude payroll from working-capital planning because payroll is an operating rather than job cost.

Correct answer

Finance or reserve enough working capital to cover the precollection cash gap rather than treating the day-30 billing date as cash on hand.

Objective/domain: Establishing the Contracting Business (11%)

Source: U.S. Small Business Administration — Manage Your Business / Manage Your Finances

Question 9 A switchgear manufacturer needs 28 weeks after approved submittals. The electrical subcontractor asks to release fabrication from an unreviewed submittal to protect the schedule. What is the best trade-operations decision?

Answer choices

  1. A. Release fabrication immediately because long lead time transfers design-review risk to the manufacturer.
  2. B. Wait until the planned installation date approaches before resolving the submittal because fabrication is the supplier's responsibility.
  3. C. Replace the manufacturer solely because its lead time is long, without checking the specified product, substitutions, or approval path.
  4. D. Expedite the submittal review, but do not treat unreviewed fabrication as approved absent an authorized early-release mechanism.

Correct answer

Expedite the submittal review, but do not treat unreviewed fabrication as approved absent an authorized early-release mechanism.

Objective/domain: Managing Trade Operations (10%)

Source: AIA Contract Documents — Does a Contractor Need to Review Subcontractor Submittals?

Question 10 The superintendent's daily logs show masonry production averaging 1,000 ft²/day for the last two weeks. The monthly schedule update still forecasts 1,600 ft²/day with no documented change in crew size, method, or conditions. What should the project manager do?

Answer choices

  1. A. Keep 1,600 ft²/day because the baseline schedule is a contractual promise and should never reflect actual performance.
  2. B. Reforecast using defensible productivity or document a credible recovery plan.
  3. C. Delete the daily logs because they conflict with the schedule.
  4. D. Increase percent complete manually until the forecast finish matches the baseline.

Correct answer

Reforecast using defensible productivity or document a credible recovery plan.

Objective/domain: Construction Procedures and Operations (13%)

Source: U.S. Army Corps of Engineers ER 1-1-11 — Project Schedules

Where to go after the daily web set

How are Florida General Contractor questions generated?

dotCreds builds Florida General Contractor practice questions from public exam objectives and Florida DBPR exam and documentation references. The questions are written for realistic study practice, not copied from exam dumps.

How are explanations sourced?

Each question includes an explanation and, when available, a source link back to the provider documentation or reference used to validate the answer. That keeps the practice tied to study material you can actually review.

What score do I get?

The page tracks today's answered count and accuracy for the 10-question daily set, then saves a 7-day score history on this device so you can see your recent practice trend.

Why use this site?

The site is the fastest way to start Florida General Contractor practice without installing anything. It is built for daily recall, quick weak-topic discovery, and source-backed explanations you can review immediately.